RAJSURAKSHA INFRA DEVELOPER's residential project coming up in Palghar, Maharashtra.

RAJSURAKSHA INFRA DEVELOPER's residential project coming up in Palghar, Maharashtra.
The image is a stock Image & does not represent the actual image of the project, pls contact the developer for more info.

Rajsuraksha Complex is a new and forthcoming residential project by RAJSURAKSHA INFRA DEVELOPERS in Palghar Maharashtra with a RERA certification ID: P99000047657 that is authorized by the Maharashtra Real Estate Authority on November 18th, 2022. This is developer's first project in the real estate sector.

According to MahaRERA, the planned completion date for the present project is September 30, 2027.

Location Insights:-

Palghar is a town and municipal municipality located in the Konkan region of the Indian state of Maharashtra. It is located in the Mumbai Metropolitan Region and has served as the Palghar district's administrative center since 2014. Palghar is a fantastic area in Thane.

In conclusion, Palghar has a reputation for being a rapidly growing metropolitan center in the MMR, along with a burgeoning industrial zone and lush, pristine surroundings. Palghar is now a sought-after location as a consequence of a variety of measures the government has undertaken and the ensuing rise in local economic activity.

Promoters Details:-

RAJSURAKSHA INFRA DEVELOPERS is the promoter of the Rajsuraksha. The members involved are RAJIV RAME GOWDA and SURAKSHIT NAND MAURYA. Detailed information can be found below:

Member Name Designation
RAJIV RAME GOWDA Partner
SURAKSHIT NAND MAURYA Partner
SURAKSHIT NAND MAURYA Authorized Signatory

Land Owner/Investor:-

YASHVI REALTY LLP is the sole partner of the project Rajsuraksha Complex.

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Rajsuraksha Complex YASHVI REALTY LLP Partnership Revenue Share

Bank Details:-

The designated bank account for this project is with UNION BANK OF INDIA (IFSC Code -UBIN0561380)

Technical details as per MahaRERA for the project:-

The development's plot survey number is Gat no 24, with the east boundary facing Nalla, the west boundary facing Slum Area, the south boundary facing Slum Area, and the north boundary facing Nalla.

The total number of wings suggested by the developer in the layout/plots is one, and they have gained approval for that one wing, which was applied for MahaRERA Registration. The MCGM has not yet been approved. The total project/plot area is around 4259.58 sqmts.

According to the authorized projects list issued by MahaRERA, there is no allotment for recreational open space. The permitted total build-up area of the plot is approximately 4259.58sq mts, while the total area sanctioned for construction under MahaRERA is 4259.58sq mts.

Building details of the project:-

According to RERA, Rajsuraksha Complex Building, no 3 has received approval for 7 floors, and one plinth. There is no podium nor parking space allotment available in this project.

The Rajsuraksha Complex consists of only one residential building with multiple units having varied carpet area. The building contains a total of 106 apartments.  The construction consists of 1RK  and 1bhk. The Space for 1RK varies from (17.4 - 22 sqmts) and 1BHK varies from (26.39 - 29.91sqmts).

Specific information about the project units is provided in the information below:-

Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Total
1 1RK 19.75 7 138.25
2 1BHK 29.91 7 209.37
3 1RK 19.43 1 19.43
4 1BHK 26.71 2 53.42
5 1RK 21.41 4 85.64
6 1RK 17.4 1 17.4
7 1BHK 26.39 7 184.23
8 1RK 22 35 770
9 1BHK 29.06 14 406.84
10 1BHK 27.44 28 768.32

Current work status of the project as per MahaRERA:-

50% of the project excavation has been completed.

Facilities and amenities:-

The project includes amenities such as Internal Roads & Footpaths, Water Conservation, Rainwater Harvesting, Energy Management, Fire Protection, And Fire Safety Requirements, Electrical Meter Room, Sub-Station, Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Landscaping & Tree Planting, Street Lighting.

Experts working on the project:-

Vastu Shilp (Architect), Darsh Consult (Engineer), Bharat Dhonde & Co (Chartered Accountant), and GS Enterprises (Contractor) are among the professionals working on the project, according to the information posted on the MahaRERA website on November 18th, 2022.

Litigation Details:-

There are currently no litigation records in this project.

To get such latest updates for every RERA-approved project in your desired area, subscribe to AryaBot and get updates directly on your WhatsApp. AryaBot offers a free list of new RERA-approved real estate developments on your WhatsApp.

Know more about AryaBot at ReunionHQ

Note: This is not a promotional, marketing, or endorsement page for any real estate project. This is only for informational use. Data published here may not be updated as per the current status and can also be incorrect due to human error. We do not take any liabilities arising out of the same. Please read our terms and conditions for more details.

RERA stands for Real Estate Regulatory Authority and is the Government body for regulating Real Estate Developers and Agents (Brokers) It came into existence in 2016 and aims to protect the interest of property buyers. Every under-construction property must obtain a RERA certificate and disclose a completion date before selling units to property buyers/investors. In India, each state has its own laws governing real estate. MahaRERA is the regulatory body for Maharashtra (Maharashtra Real Estate Regulation & Development Authority)